$30 - $45 per Hour
Cincinnati, OH
Contract
Duration: 12 Months
Note: Hybrid 3 days Onsite in a week.
Job Description:
The Business Analyst position will be referred to in this job description as a Closeout Project Manager.
This is a legacy title and this is not a project management role, but instead a support role for a team of project managers.
A project transitions from the Execution Project Manager to the Closeout Project Manager after it is placed in service, major construction and invoicing are substantially complete, and reimbursable invoices have been sent.
Responsibilities:
The CPM reviews the Transition Form, Permitting Checklist, and Closeout Checklist before accepting ownership of the remaining closeout work.
After handoff, the CPM coordinates unresolved items, including ECRs, GIS updates, asset data, work orders, facility ratings, ARC failures, redlines, as-builts, permits, site cleanup, excess materials, double-pole removal (SPANS), Team Member activities, monthly CCFs, forecasts, follow-up communications, and reporting.
Financial closeout requires validating the AISD in PowerPlan, confirming applicable AFUDC charges have stopped, finalizing invoices and materials, and resolving ARC failures. All activities must be completed by the Feeder Close Date - six months after the in-service date - to prevent late costs from being charged to operations and maintenance instead of the capital project.
CPM Focus Activities
CPM follows up on anything that has not been marked Yes or N/A on Closeout checklist:
Verify all Equipment Change Requests (ECR's) have been submitted. Consult with Engineering to ensure quantity of ECRs is accurate.
Assure engineering has submitted GIS Update Request to GIS (Graphical Information Systems) team. (Small World, My World).
Asset Automation has been run in Maximo (Hierarchy check, All Asset Data Complete). – email from EAM team
Verify Work Order (WO) tasks have been completed and closed. If not, contact the work order owner to get work order completed.
Facilities Ratings Database Updated. Received email from FAC-008 team.
Works with ARC Analyst to resolve ARC failures
Works with engineering on redlines & As-built completion
Follows up with Permitting to make sure all permits are closed out
Works to get double poles that have not been pulled (SPANS) working with third party vendor
Provide Team Member updates on Closeout activity until Project is closed.
Completes all CCF’s monthly until project is closed.
Adjust and manages Forecast until project is closed.
Follow up emails to complete all tasks, as required
Monthly Reporting, as required
About US Tech Solutions:
US Tech Solutions is a global staff augmentation firm providing a wide range of talent on-demand and total workforce solutions. To know more about US Tech Solutions, please visit www.ustechsolutions.com
US Tech Solutions is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, colour, religion, sex, sexual orientation, gender identity, national origin, disability, or status as a protected veteran.
AI Statement: By applying, you acknowledge that AI-assisted tools may be used during hiring.
IND01