Minimum Qualifications:
- High school diploma or equivalent.
- Must be able to pass PSM test.
- Strong problem-solving skills and attention to detail.
Responsibilities:
- The operation of the east end of the Proctor single pass dryer will be as outlined in Dryer Discharge Conveyor & Scales Operating Procedures.
- The baler equipment on the process lines will be operated as outlined in Baler Operating Procedures.
- The conveying equipment on the process lines will be operated as outlined in Conveying & Automatic Packaging Operating Procedures.
- The metal detectors will be operated as outlined in Metal Detector Operating Procedures.
- The film wrappers will be operated as outlined in Film Wrapper Operating Procedures.
- Packaging containers will be made as outlined in the Port Neches Elastomers Packaging Manual.
- The Packaging Operator A will be responsible for the proper identification of the bales and packaging of rubber as outlined in the Port Neches Elastomers Packaging Manual and the Conveying & Automatic Packaging Operating Procedures. All bales being packaged must have proper I.D. tape identifying product being produced. After a type change all film wrapper I.D. tape is to be removed from film wrapper, film wrapper area, and out of the building.
- Housekeeping in the area of responsibility will be maintained in an orderly and safe condition as described in Work Instructions PROC-WI-001.
- During a product change, it is imperative that the first 2 bales of product be rejected from each baler to prevent polymer cross contamination.
- Check the operating conveyors (screw, belt, roller, and air operated) for rubber build up and remove any build up from the equipment before it can cause a plug up or damage to the equipment. The conveyor will also be checked for possible mechanical problems and maintenance needs.
- All finished product testing required for the various polymers produced at Port Neches Elastomers listed in the Q.A. Sampling Schedule QA 034 will be performed during startups. You will have a fifteen minute window, before the hour the sample is do, to have the samples in the box or turned in the lab. All cut bale samples will be taken from the top layer of the skid. When the lab results come in, compare the results with the coagulator inlet results ran. The inlets will be reported in ParcView. The Packaging Operator A will inspect the bales for color consistency, contamination (dark spots), wet spots, proper film sealing, proper I.D. tape, bale weight and bale temperatures to ensure good quality product is being packaged prior to sending to the customers.
- ACTIONS TO TAKE WITH OUT OF SPEC RESULTS: a. Call coagulator and have the dryer shut down, leave the heat on the dry the rubber. b. Pull a before and after sample (ex. Skid 6 is wet then pull skid 5 and 7 for recheck)
- ACTIONS TO TAKE WHEN VOLATILE MATTER START TRENDING UP: a. Notify supervisor and coagulator. b. Pull a volatile matter sample on the next skid.
- Every two hours, random bales are to be checked for contamination and wet spots. If during these inspections any problems are detected, the supervisor must be notified. The problem must be corrected immediately, or the line should be shut down until corrective measures are taken. Any problems or items requiring corrective action should be noted in the shift supervisor’s log.
- The Packaging Operator A will assure prime finished product is placed in a quality package that is properly identified and ticketed before the unit is removed from the line as outlined in the Port Neches Elastomers Packaging Manual. If the end-of-line scales are out of service, the following steps must be followed for every skid weighed out in
the warehouse:
Hard copy printouts are UNCONTROLLED and only valid for 24 hours from the print date: 11/20/2026 PN.PROD.BALER.1 Baler Technician Job Functions Revision #: 10 Page 2 a. Weigh out the skid in the warehouse b. Verify that the skid labels match the product inside of the skid c. Verify that there is no contamination/trash inside of the skid d. Apply the lid to the skid e. Fill out the Skid Inspection Log
- The Packaging Operator A will handle all packaging material in the packaging area. The Packaging Operator A will assure that all required labels, including the OSHA label are on all units as specified by the Detail Letter for the polymer being run. Assure an adequate and orderly inventory of packaging materials is on hand in the packaging area.
- The Packaging Operator A will check bales for proper film sealing and the automatic stackers for proper pattern and/or damage to units. The items are mandated by the completion of the Electronic Baler Log.
- Separation of nonconformance (non-standard) material is essential. Types of nonconformance material include off weight bales, contamination, moisture content (wet bales), film wrap not sealing, bale appearance (loose bales) and metal detector rejects. All bales will have proper I.D. tape across top of bale.