Construction Scheduler
Johnson, Mirmiran & Thompson is a dynamic, 100% employee-owned consulting firm with more than 2,800 professionals, providing a full range of multidisciplinary engineering, architecture, information technology, and related services to public agencies and private clients throughout the United States. JMT is currently ranked #45 on Engineering News-Record's list of the Top 500 Design Firms.
JMT's Project Controls team is seeking a Construction Scheduler for their Corporate office in Hunt Valley, Maryland. The successful candidate will be responsible for scheduling of various construction projects. Project types include both vertical (facilities) and horizontal (infrastructure).
Immigration sponsorship or support (e.g. H1B, F-1 CPT/OPT/STEM OPT) is not available for this position, except for qualified candidates eligible for the TN visa classification.
Compensation for this position is $80,000.00 - $100,000.00 annually, commensurate with experience, education and certifications. The provided range is a good faith estimate based on the requirements described within the job description. We notice that we receive a wide variety of applicants and recognize that the person selected may be less experienced or more experienced. If so, the actual salary range may vary from the estimate provided.
JMT offers outstanding opportunities for career and professional growth. We are 100% employee-owned (ESOP) and offer outstanding health care coverage and other benefits, including:
- Affordable Medical, Dental & Vision Insurance
- Company paid Life and Disability Insurance
- Paid Time Off
- Paid Holidays
- Paid Caregiver Leave Program
- 401K Retirement Plan (Traditional and Roth options)
- Employee Stock Ownership Plan (ESOP)
- Career Development Programs
- And more
Essential Functions and Responsibilities
- Develops, updates and maintains baseline and updated construction schedules using Primavera P6 and Asta Powerproject
- Tracks the status of critical activities impacting the project
- Monitors program milestones and interdependencies
- Analyzes project planning, schedule updates and delays, including schedule impact and delay analyses
- Compares schedule updates against the baseline to identify variances and delays
- Performs schedule quality checks on logic, constraints and float using scheduling software tools
- Provides alerts on items impacting the project schedule
- Identifies the critical path and suggests alternatives to regain slippage to the schedule
- Identifies project risks and options for mitigation
- Imports, exports and reconciles schedule data between scheduling platforms (e.g., Primavera P6, Asta Powerproject and Microsoft Project)
- Prepares schedule reports, dashboards and presentations using Microsoft Project, Excel, PowerPoint and Visio
- Writes and prepares technical reports
- Attends meetings and leads discussions on project status
- Develops strategies to support claim negotiations
- Provides technical support in claims litigation
Nonessential Functions and Responsibilities
- Perform other related duties as assigned
Required Skills
- Proficient with Asta Power Project and Primavera Project Management 6.0
- Proficient in Microsoft Office Suite including Project, Word, Powerpoint, Visio and Excel
- Ability to interpret contract specifications and drawings
- Knowledge of contract procedures and principles
Required Experience
- Bachelor's degree in Construction Management, Civil Engineering, Architecture or related technical field
- Professional certification in AACE, CMAA, PMI, or PSP preferred
- Minimum of 5 years Construction Management experience preferred
Working Conditions
Work is performed within a general office environment. Work is generally sedentary in nature, but may require occasional standing and walking. Lighting and temperature are adequate and there are no hazardous or unpleasant conditions caused by noise, dust, etc. within the office environment.
Qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, disability, protected veteran status or any other characteristic protected by state or federal law.