Find work in the United States.
A simpler way to find your next job.
Added
Data Scientist II, Senior or Principal
Black Hills Energy
Reporting Relationship: Manager, Enterprise Data Science
Added
Asset and Configuration Analyst II
Centene Corporation
Education/Experience: A Bachelor's degree in a quantitative or business field (e.g., statistics, mathematics, engineering, computer science) and requires 2 - 4 years of related experience.
Added
Quality Assurance Inspector
City of New York
Only candidates who are permanent in the Construction Project Manager title or those who took and passed the Open-Competitive exam (#3042) or (#5058) or filed for open-competitive exam…
Added
Senior Design Reviewer (Mechanical)
City of New York
The Department of Design & Construction, Division of Public Buildings, Architecture and Engineering Unit seeks a Senior Design Reviewer. The selected candidate will be responsible for…
Added
Senior Estimator
City of New York
…manner while maintaining the highest degree of architectural, engineering and construction quality. The selected candidate will work with the FEP Program Executives in the analysis of…
Added
Senior Project Manager
City of New York
The NYC Department of Design and Construction, Public Buildings Division is seeking a Senior Project Manager. The selected candidate will manage complex capital commitment projects; review…
Added
Senior Project Manager
City of New York
…manner while maintaining the highest degree of architectural, engineering and construction quality. The selected candidate will work with the FEP Program Executives in the analysis of…
Added
Senior Project Manager
City of New York
The NYC Department of Design and Construction, Public Buildings Division seeks a Senior Project Manager. The selected candidate will manage complex capital commitment projects; review…
Added
Engineer-in-Charge
City of New York
- Liaise continuously with internal DDC divisions including Design, Utility Coordination, and Program Management to align field execution with engineering intent.
Added
APS-3: Logistics Analyst Planner
Trinzic
…actions in support of the projects/programs between AFSBn-CHS, Program Manager, Deputy Program Manager, Operations Manager, and Operations…
Added
Circuit Design Engineering Associate Manager, Avionics, Secret Clearance
Lockheed Martin
Join us as a Circuit Design Engineering Associate Manager and become a member of the US Navy's Fleet Ballistic Missile (FBM) D5 Life Extension 2 (D5LE2) Avionics team.
Added
BMC3I Program Manager - TAPLab
Odyssey Systems Cons
BMC3I Program Manager - TAPLab Job Locations US-CO-Colorado Springs ID 2026-9185 Category Program Management Type Full Time Biweekly Hours 80 Location : Name 2424 Garden of the Gods Road…
Added
BMC3I Program Manager - TAPLab
Odyssey Systems Cons
BMC3I Program Manager - TAPLab Job Locations US-CO-Colorado Springs ID 2026-9185 Category Program Management Type Full Time Biweekly Hours 80 Location : Name 2424 Garden of the Gods Road…
Added
Staff Full Stack Engineer (Infrastructure) - FT telework - EADGE-T
Lockheed Martin
Come join the EADGE-T team and be part of an effort to upgrade the program’s technology and bring new capabilities to the UAE customer. The EADGE-T system is an integrated air missile…
Added
HVAC and Plumbing Quality Control Engineer (Engineer II)
Fairfax County
Under the direction of the Facilities Supervisor and/or Facilities Manager, performs quality control and assurance of contractor work for the repair, maintenance, and replacement of complex…
Added
Industrial Hygienist I/II - Ames National Laboratory
Iowa State University
Preferred Qualifications:Graduate degree in a relevant science, engineering, industrial hygiene, or occupational/environmental health discipline or at least three years of related…
Added
Quality Control Manager - Steel Bridge Fabrication
GPAC
We're looking for an experienced Quality Control Manager to lead QC for a structural steel fabrication operation focused on bridge work near Columbia, Missouri. You'll own the quality…
Added
Quality Control Manager - Steel Bridge Fabrication (Relocation to Columbia, MO)
GPAC
Ready for a move? We're hiring an experienced Quality Control Manager to lead QC for a structural steel bridge fabrication operation in Columbia, Missouri, with relocation assistance for…
Added
Quality Control Manager - Steel Bridge Fabrication (Relocation to Columbia, MO)
GPAC
<p>Ready for a move? We're hiring an experienced Quality Control Manager to lead QC for a structural steel bridge fabrication operation in Columbia, Missouri, with relocation assistance for…
Added
Quality Control Manager - Steel Bridge Fabrication (Relocation to Columbia, MO)
GPAC
Ready for a move? We're hiring an experienced Quality Control Manager to lead QC for a structural steel bridge fabrication operation in Columbia, Missouri, with relocation assistance for…
Added
Quality Control Manager - Steel Bridge Fabrication (Relocation to Columbia, MO)
GPAC
<p>Ready for a move? We're hiring an experienced Quality Control Manager to lead QC for a structural steel bridge fabrication operation in Columbia, Missouri, with relocation assistance for…
Added
Quality Control Manager - Steel Bridge Fabrication (Relocation to Columbia, MO)
GPAC
<p>Ready for a move? We're hiring an experienced Quality Control Manager to lead QC for a structural steel bridge fabrication operation in Columbia, Missouri, with relocation assistance for…
Added
Clinical Specialist II
Abbott
Working under general direction, provides engineering, sales, educational and technical support in response to field inquiries from physicians, health care professionals, patients, and…
Added
Clinical Specialist II, CPT - Jacksonville, FL
Abbott
Provides technical, clinical, and programming assistance, primarily in support of 1-2 Territory Manager(s).
Added
Program Manager
GPAC
A medical device manufacturer specializing in injection molded components needs a Program Manager to lead customer programs from concept through commercialization in a regulated life…