Back to results

Senior Construction Schedule Manager

  • Rochester, MN, United States

$11.41 USD / hour

Applications open in a new tab.

Job details

Pay
$11.41 USD / hour
Posting language
English
Posted

Original job description

Job Duties

McGough is a respected partner that brings six generations of experience to high profile, unique and complex construction projects. We take great pride in our people and their extraordinary expertise in planning, development, construction and facility management. McGough employee tenure reflects the commitment and pride we share in our work. Ask anyone who knows us - the caliber of our people sets us apart.

SENIOR CONSTRUCTION SCHEDULE MANAGER

The Senior Construction Schedule Manager will primarily be responsible for developing and maintaining schedules for commercial construction projects. McGough uses critical path scheduling along with industry best practices and schedule department standards to track and maintain progress. The Senior Construction Schedule Manager will be responsible to attend weekly meetings to review and update progress, review subcontractors weekly work plans and both manage and update the overall project schedule with various project tracking tools. The position will also lead planning meetings periodically, develop progress metrics and reporting, and support the team in creating specific work plans for each scheduled milestone along the critical path.

Qualifications:

Required:

Four-year degree in Construction Management, Engineering, or related degree

Minimum of 6 years relevant experience, or in lieu of education, 10+ years of relevant experience

Experience in construction phase of project lifecycle

Experience working as part of a design-build contractor

Skilled at developing and maintaining relationships with owners, subcontractors, senior leaders, and project teams.

Proficiency in construction scheduling or project management

Excellent communication skills

Preferred:

10+ years of Construction Industry experience, including healthcare construction

Forensic scheduling and Time Impact Analysis management expertise

Knowledge with Lean construction practices, including pull planning and short interval or lookahead planning

Experience preparing project schedules using commercially available scheduling software

Advanced proficiency in Primavera (P6) Software

AACE Planning & Scheduling Professional (PSP) or equivalent preferred

Experience with cost and resource loading, earned value management and forecasting

Experience with change management, impact and delay tracking and fragments.

Office and Travel:

Hybrid available. Must have potential to be onsite in Rochester at project 10%

Responsibilities and Tasks:

Understand and implement McGough Scheduling Standards and industry best practices on projects within the program

Lead the planning effort alongside Project Manager and McGough Schedule Department. Collaborate and make recommendations to project management team in planning the work, including developing Work-Breakdown Structure (WBS), durations, and sequencing the work (hard restraints and soft restraints)

Analyze drawings, specifications, and construction related documents in preparation and acceptance of usable Baseline schedules for construction

Monitor project schedules being developed and updated by Operations staff and provide support and guidance as necessary

Interact with the Operations team and represent McGough Construction in the best manner to owners, subcontractors, and their representatives

Support the development of conceptual bid and proposal schedules with Operations staff and present to selection committees if required

Utilize analytics to identify and report on project trends and support with risk mitigation

Effectively cost and manpower load schedules for use during the execution of the project

Evaluate the actual construction status relative to proposed plan using earned value management techniques

Analyze and communicate the impact of potential and actual changes to the schedule

Prepare Time Impact Analyses per recommended practices by commonly accepted standards

Assist project teams to develop "what if" scenarios to explore alternate sequencing, document, mitigate or avoid schedule delays

Develop detailed construction schedules using Primavera P6

Interact with project teams to define scope of work to develop and update detailed schedules

Coordination with non-construction processes i.e. submittals, procurement, design and permitting progress

Engage with project team on pull planning and development of lookahead schedules in accordance with McGough Scheduling Standards

Participate in weekly subcontractor meetings

Identify and track project constraints and key interim milestones

Evaluate project schedule progress and performance and identify developing problem areas, using earned value management

Analyze critical path and constraints to determine effect of changes to schedule and recommend work-arounds

Responsible for special projects and other departmental duties as necessary

Physical Requirements:

The physical requirements listed here are representative of those that must be met by an employee to successfully perform the essential functions of this job. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions.

Position involves sitting for extended periods of time at employee's work station and during meetings as well as while traveling, either by plane or car. Employee needs to be able to lift up to 20 pounds as frequently as needed to move objects; dexterity to write and manipulate computer keyboard and mouse; ability to hear and speak clearly; and ability to distinguish between colors on graphs and charts.

Employee will be required to visit multiple construction jobsites on a weekly or bi-weekly basis which may expose the employee to dirt, dust, uneven surfaces, outdoor weather conditions and extreme temperatures.

In alignment with our commitment to pay transparency, the base salary range for this position is $130,000- 160,000, excluding fringe benefits or potential bonuses. If you join McGough, your final base salary will be determined by several factors, including geography, location, skills, education, and experience. Furthermore, we place significant value on pay equity among our current team members as part of any final job offer.

Please note that the range provided above reflects the hiring range for this role. Hiring near the top end of this range would be atypical, as we aim to allow room for future salary growth. Additionally, McGough offers a comprehensive compensation and benefits package. This includes insurance coverage for medical, dental, vision, life, and disability. We also provide generous retirement plans, voluntary benefit plans, parental leave, substantial paid time off, and holiday pay.

Minimum Education Required

Bachelor Degree

Minimum Experience Required

6 - 20 years

Shift

First (Day)

Number of Openings

1

Public Transportation Accessible

Yes

Veterans Encouraged to Apply

No

Physical Required

Yes

Drug Test Required

Yes

Compensation

$11.41 / Hourly

Postal Code

55901

Job Type

Full Time

Place of Work

On-site

Requisition ID

992363~55901~15541511

Job Benefits

Not specified

More about this job

Skills

  • Scheduling
  • Reporting
  • Construction management
  • Project management
  • Communication skills
  • Construction industry
  • Primavera
  • Forecasting
  • Change management
  • Microsoft Office
  • ESRI What if?
  • Construction methods
  • Procurement
  • Heavy lifting
  • Compensation and benefits

Report this job