Closed listing
Project Manager – Data Center Construction
- Canton, OH, United States
This opening has closed.
The original listing is kept below for reference.
Job details
- Closing date
- Posting language
- English
- Posted
Similar jobs hiring now
Search current openingsOriginal job description
Archived listing. The details below describe a past opening.
Role Summary
We're hiring a Project Director or Project Manager to lead ground-up delivery of our Midwest data center campuses. The site will be a 50+ MW Data Center in the Canton, OH area. You'll lead general contractors, MEP trades, utilities, equipment vendors, and design teams from preconstruction through commissioning and turnover. You'll own schedule, budget, safety, and quality, and make sure each facility is delivered on time, on budget, and to hyperscale standards.
Key Responsibilities
- Lead full-lifecycle, ground-up delivery of data center campuses: site development, shell and core, MEP fit-out, and commissioning through turnover.
- Represent the owner in managing general contractors and trade partners, holding them to schedule, cost, quality, and safety commitments.
- Own the master project schedule. Drive critical-path planning, look-ahead schedules, and recovery plans.
- Manage project budgets, cost reporting, change orders, and forecasting. Report to executive leadership.
- Manage procurement and delivery of long-lead equipment: generators, switchgear, UPS, transformers, chillers, CRAH/CRAC units, and liquid cooling systems.
- Coordinate with utilities on power delivery, substations, interconnection, and energization timelines.
- Oversee design reviews, RFIs, submittals, and constructability reviews with architects and engineers.
- Drive Level 1–5 commissioning with Commissioning Agents, through integrated systems testing (IST) and handover to operations.
- Enforce a safety-first culture and compliance with OSHA, local codes, and permitting requirements.
- Manage quality control and punch lists, and get closeout documentation done.
- Serve as the primary point of contact for tenant and hyperscaler stakeholders. Run project meetings and status reporting.
- Identify and mitigate project risks, including supply chain, labor, power availability, and schedule compression.
Required Qualifications
- 10+ years in construction project management, with at least 5 years delivering data center or mission-critical projects
- Proven ground-up delivery of data center builds of 50 MW+ (hyperscale or colocation)
- Experience managing GCs and trade partners on projects of $100-250M+
- Strong working knowledge of data center MEP systems: medium and low voltage electrical, generators, UPS, cooling, and BMS/EPMS
- Expertise in scheduling (Primavera P6 or MS Project) and cost control
- Experience with Level 1–5 commissioning and IST
- Working knowledge of OSHA, NFPA 70/70E, local building codes, and permitting
- Bachelor's degree in Construction Management, Engineering, or a related field, or equivalent experience
- Must live near one of the three sites or be willing to relocate (relocation assistance provided)
Preferred Qualifications
- Experience with a data center developer or a GC that builds data centers
- Hyperscale or AI/high-density data center experience, including liquid cooling or direct-to-chip
- Utility coordination and substation or interconnection experience
- Experience on campus-scale (multi-building) or fast-track design-build programs
- PMP, CCM, or OSHA 30 certification
- Experience with Procore, Autodesk Construction Cloud, or similar platforms
About INSPYR Solutions
Technology is our focus and quality is our commitment. As a national expert in delivering flexible technology and talent solutions, we strategically align industry and technical expertise with our clients' business objectives and cultural needs. Our solutions are tailored to each client and include a wide variety of professional services, project, and talent solutions. By always striving for excellence and focusing on the human aspect of our business, we work seamlessly with our talent and clients to match the right solutions to the right opportunities. Learn more about us at inspyrsolutions.com.INSPYR Solutions provides Equal Employment Opportunities (EEO) to all employees and applicants for employment without regard to race, color, religion, sex, national origin, age, disability, genetics, or any other protected status. INSPYR Solutions complies with all applicable laws governing nondiscrimination in employment in every location in which the company has facilities. Applicants requiring reasonable accommodation during the application or interview process should contact HR@inspyrsolutions.com for assistance.
Information collected and processed through your application with INSPYR Solutions (including any job applications you choose to submit) is subject to INSPYR Solutions' Privacy Policy and INSPYR Solutions' AI and Automated Employment Decision Tool Policy: https://www.inspyrsolutions.com/policies/. By submitting an application, you are consenting to being contacted by INSPYR Solutions through phone, email, or text.
26-160110
More about this job
Skills
- Reporting
- Forecasting
- Procurement
- Regulatory compliance
- Oversee quality control
- Documentation
- Supply chain management
- Scheduling
- Primavera
- Microsoft Project
- Building codes
- Construction management
- Track geometry
- PMP
- Procore