Closed listing
Data Center Construction Manager (Glendale, AZ)
- Phoenix, AZ, United States
From $74 USD / hour
This opening has closed.
The original listing is kept below for reference.
Job details
- Pay
- From $74 USD / hour
- Posting language
- English
- Posted
Similar jobs hiring now
Search current openingsOriginal job description
Archived listing. The details below describe a past opening.
Required Skills & Experience
5-7 years of post-graduation construction management experience At least 2 years of documented experience working on mission critical or data center projects Procore Experience HVAC/Cooling System Background and/or Electrical Background Strong reporting/scheduling experience Experience being superintendent of a construction site and dealing with contractors/sub-contractors Bachelor's Degree in Engineering or Construction or similar field of practice
ONSITE IN GLENDALE, AZ 5 DAYS/WEEK
Job Description
This position will be staffed by one (1) individual who is expected to distribute their time (and time onsite) across the program according to the staffing matrix provided in this RFP. Travel between sites will be required on an as-needed basis to for specific events including: milestone pre-walks, billing and change order reviews, contractor meetings, and coordination of CMS staff. The position shall be billed hourly based on actual hours worked on projects. The CM will be required to observe construction directly and must be capable of using ladders, scaffold and other jobsite aids while complying with GC and OSHA safety requirements. Minimum qualifications for proposed staff for this position are and fifteen (7) years of post-graduate construction management experience with demonstrated experience on projects of similar size and scope and a BA in engineering, architecture, or construction management. Twenty (10) years of documented experience on relevant mission critical commercial, institutional, or public sector construction projects may be substituted for the education requirements.
More about this job
Skills
- Construction management
- Procore
- HVAC
- Reporting
- Scheduling
- CMS