Find work in the United States.

6,526,549 jobs across our US network. How we count

Jobs in the United States

25+ jobs

Email me new jobsSave this search
  • Sr Product Manager, Platform & Integrations (Remote)

    BenefitHub

    Remote, United States

    We're hiring a Sr. Product Manager to own the systems underneath the BenefitHub experience: our core platform, data model, and the integrations that connect us to clients, merchants, and…

  • AI Platform Engineer

    New York University

    New York, NY

    • $170,000 to $190,000 USD / year

    Required Education:Bachelor's Degree Bachelor's degree in Computer Science, Engineering, Information Technology, or a related quantitative field, or an equivalent combination of education…

  • Piping Field Engineer

    Bechtel Corporation

    Port Arthur, TX

    Must have the ability to walk into and out of the project (enter/egress)

  • Instrumentation Field Engineer

    Bechtel Corporation

    Port Arthur, TX

    Must have the ability to walk into and out of the project (enter/egress)

  • Electrical Field Engineer

    Bechtel Corporation

    Port Arthur, TX

    Must have the ability to walk into and out of the project (enter/egress)

  • Area Project Controls Manager

    Bechtel Corporation

    Phoenix, AZ

    …The reservoirs and powerhouse will be connected by two tunnel systems. Bechtel is providing engineering, procurement and construction services which will include, but is not limited to,…

  • Cost Engineer

    Bechtel Corporation

    Millersport, OH

    …gas turbines, reciprocating engines, battery energy storage systems (BESS), substations, and associated balance of plant infrastructure. The scope includes major civil, mechanical,…

  • Reporting Manager

    Bechtel Corporation

    Millersport, OH

    Integrate project controls data from cost, scheduling, quantity tracking, procurement, engineering, and construction systems

  • Planner

    Bechtel Corporation

    Millersport, OH

    …gas turbines, reciprocating engines, battery energy storage systems (BESS), substations, and associated balance of plant infrastructure. The scope includes major civil, mechanical,…

  • Trend Engineer

    Bechtel Corporation

    Millersport, OH

    …gas turbines, reciprocating engines, battery energy storage systems (BESS), substations, and associated balance of plant infrastructure. The scope includes major civil, mechanical,…

  • Senior Planner

    Bechtel Corporation

    Millersport, OH

    …gas turbines, reciprocating engines, battery energy storage systems (BESS), substations, and associated balance of plant infrastructure. The scope includes major civil, mechanical,…

  • Process Technician I

    ICU Med

    Salt Lake City, UT

    Work as a team with the production, quality, and engineering departments to guarantee the quality of the processed parts.

  • Piping Field Engineer

    Bechtel Corporation

    Port Arthur, TX

    Must have the ability to walk into and out of the project (enter/egress)

  • Structural Field Engineer

    Bechtel Corporation

    Port Arthur, TX

    Must have the ability to walk into and out of the project (enter/egress)

  • Electrical Field Engineer

    Bechtel Corporation

    Port Arthur, TX

    Must have the ability to walk into and out of the project (enter/egress)

  • Instrumentation Field Engineer

    Bechtel Corporation

    Port Arthur, TX

    Must have the ability to walk into and out of the project (enter/egress)

  • Structural Field Engineer

    Bechtel Corporation

    Port Arthur, TX

    Must have the ability to walk into and out of the project (enter/egress)

  • Instrumentation Field Engineer

    Bechtel Corporation

    Port Arthur, TX

    Must have the ability to walk into and out of the project (enter/egress)

  • Electrical Field Engineer

    Bechtel Corporation

    Port Arthur, TX

    Must have the ability to walk into and out of the project (enter/egress)

  • BEO Welding & Welding Equipment Engineer

    Bechtel Corporation

    Houston, TX

    Provides specialized welding engineering support for welding activities to ensure construction meets all code, client/engineering specifications and Bechtel procedures and standards.

  • Maintenance Technician - $19.00 Starting!

    LifeSouth Community Blood Centers

    Gainesville, FL

    • $19 to $20.9 USD / hour

    …our blood center operations, including HVAC and refrigeration systems, access control systems, power generation equipment, medical devices, and fleet…

  • Document Control Specialist I

    Quanta Infrastructure Solutions Group, LLC

    Houston, TX

    Position Overview:The Document Specialist I is responsible for supporting document systems management processes including document control, revision tracking, engineering drawing lifecycle…

  • Production Operator - First Shift - 90 Day Increase Eligible

    TTM Technologies, Inc.

    Salem, NH

    TTM Technologies, Inc. is a leading global manufacturer of technology products, including mission systems, radio frequency (“RF”) components, RF microwave/microelectronic assemblies, and…

  • Planning Supervisor

    TTM Technologies, Inc.

    Santa Ana, CA

    Due to ITAR regulations, must hold U.S

  • Lead Applied AI Architect

    TGH

    Tampa, FL

    Ten (10) years of professional engineering experience, including at least four (4) years designing and building AI/ML systems and at least two (2) years architecting, deploying, and…

Get in touch
MovoJobs

Contact us