Position Title: LEAD Engineer (Engineer IV / L4), Natural Gas Piping Design,
Onsite in Houston, TX 5x per week
Project Scope: - Scaling up its natural gas engineering workforce through an SOW model.
- The Staff Engineer takes on the more complex design projects and reviews L1/L2 work.
- They run projects from design through construction and completion, including plans, specifications, permits, easements, bid packages and contracts.
High-Level Individual Duties: - Design new or relocated natural gas distribution and transmission facilities, including related support systems and cathodic protection
- Handle design work for subdivisions, system improvements and public improvement projects
- Prepare construction drawings, long-range capacity piping plans, specifications, permits, easements, bid packages and contracts
- Develop cost estimates, material specifications and project schedules
- Review system capacity and pressure studies. The system planning group runs the models, and this person reviews them, asks questions and runs checks.
- Review L1/L2 work and recommend changes. Signatures are all that's needed, since they don't seal calculations and the manager signs off on the design.
- Coordinate design through construction and completion with internal groups, customers, developers, municipalities, DOTs and other agencies. This isn't traditional PM work, so there's no reporting or budget work.
- Review GIS and make occasional field visits via GIS and flyovers (a small percentage of time)
- Run economic feasibility studies and provide customer contribution recommendations
- Support local gas operations and prepare operational procedures
- Mentor and train new employees on design principles and processes
Must-Haves (Concepts & Tools): - Active Texas PE license (required for Senior/Staff/Lead)
- BS in Mechanical, Industrial, Civil or another approved engineering discipline
- 10+ years of utility design or related project construction design
- Understanding of pipe flow, system capacity and pressure concepts, enough to review models and run checks
- Estimating experience, including piping flow
- Ability to review GIS
- Land rights experience (easements, letters of no objection, permits). This is the biggest current challenge.
- Natural gas distribution and/or transmission piping design
- Autocad is the primary tool
- Alternative piping designers with PE licensure will be considered
- Knowledge of DOT 49 CFR Part 192 and natural gas pipeline design codes, used to check design and construction manuals against the standards-
Nice-to-Haves: - Direct natural gas utility experience, and distribution versus transmission experience
- Hydraulic and gas flow modeling tools (Synergi Gas, DNV tools or proprietary utility platforms)
- ASME B31.8, PHMSA requirements and MAOP / class location experience
- Hands-on ESRI/ArcGIS beyond review-level GIS
- Hands-on SAP work orders and material management
- TxDOT and municipal permitting experience
- Subdivision development and public improvement project experience
- Experience with out-of-state or complex projects with some PM responsibility